The US 7 Rte. 8 Connector Rd., otherwise known as the Berkshire Mall Road will be closed to all traffic on Monday October 28, 2019 from 6 a.m. until 6 p.m. for yearly crack sealing.

Crack Sealing is the process of sealing cracks in sealed roads with a hot polymer/rubberized bitumen sealant. The main purpose of cracking sealing is to prevent moisture finding its way into a road pavement. It is also used to seal cracks prior to an asphalt overlay in order to prevent reflective cracking.

More From WBEC FM